The DuT can be optionally switched on and off by using SITQ Device on/off Switch. This is necessary if no other electrical means inside the DuT is available. As a result the customer can run test suite without human being operators.
Switches physically between <= four SIM cards and between <= four DuT's
One connection available at given time / Controlled via SITQ Test Scripts
Extended unit (24 SIM's / 6 DuT's)